On Our Site

Secondary School Building Committee
Feasiblity Study and Images of Each Option
In 2009, the Town of Grafton engaged Symmes, Maini & McKee Associates, Inc.
(SMMA) as Architect and Engineer, and Joslin Lesser and Associates, Inc. (JLA) as
the Owner’s Project Manager, to undertake a Feasibility Study and Schematic
Design for Grafton Memorial High School.


Individual Images listed in second table: images can be rotated for viewing in the correct orientation in two ways:
  • Using the right click button on the mouse and selecting "Rotate Clockwise"
  • Using the the Control_Shift_Plus buttons together

Feasibility Study & Schematic Design Grafton Memorial High School
September 2, 2009
209 pages; 16 MB; PDF format
1 page; 121 kb; PDF format
2 pages; 38 kb; PDF format
10 pages; 316 kb; PDF format
38 pages; 7 MB; PDF format
20 pages; 276 kb; PDF format
30 pages; 1.5 MB; PDF format
108 pages; 8.7 MB; PDF format
Development Options Matrix and Images of Each Option
Presented to Secondary School Building Committee on July 23, 2009.
 
Providence Road - Addition (existing building remains)
Providence Road - Addition / Renovation (remove and replace existing but for academic wing)
Providence Road - New High School - Back of the Site
Providence Road - New High School - Front of the Site
Providence Road - New High School - Middle of the Site
Old Westboro Road - New High School - Front of the Site
Old Wesboro Road - New High School - Front of the Site - Option 2
2 Old Westboro Road - Back of the Site
 
30 Providence Road, Grafton, MA 01519  Phone: 508-839-5335  FAX: 508-839-4602  Hours of Operation: Mon. - Fri., 8:30AM - 4:30PM     Web Policy