The next meeting of the Library Planning and Building Committee is Monday April 3, 2017 at 7pm at the Grafton Memorial Municipal Center, 30 Providence Road. This is an open meeting and all are welcome to attend.

Other Important Dates:

Monday May 8: Town Meeting

Tuesday May 16: Town Election

NEW: Video from Community Forum Three, Wednesday December 19, 2016

NEW: Slides from Community Forum November 16, 2016

NEW: Video from Community Forum Two, Wednesday November 16, 2016

NEW: Video from Community Forum One, Thursday October 20, 2016

At Special Town Meeting on January 9, residents voted for a portion of lot 89 and all of lot 90 to be dedicated to Library use for the proposed Expansion and Renovation project; this would grant another sum of money as an eligible project cost. Should the grant, building schematics or project funding fail, the land would revert to Town-owned undesignated land.

Project History

At October Town Meeting in 2015, the Town voted to apply for accept and expend grant funds to assist with renovating and expanding the Grafton Public Library.

Please COMMENT HERE to provide feedback on Library's Building Program and proposed renovation and expansion; public input is necessary and welcome!

Applying for the grant -- and winning the grant! would allow the Town of Grafton to renovate and expand the 90-year old facility at nearly half the cost, adding a much-needed community meeting space, designated areas for quiet study, youth programs and collections, and dedicated work space for staff.

Facility size is dictated by:

  • shelving to meet a basic library standard of 4.8 materials per capita (we reduced by 20%, citing increase of digital formats)
  • seating for 10,000-25,000 residents (99-154 lounge or table seats available all the hours the library is open)
  • program elements (meeting rooms, quiet study space, staff workspace -- we have one of 4 libraries in the state without a public meeting room)
  • An additional 30% for unassignable space -- or non-program space -- for mechanical room, stairwells, hallways, closets, restrooms, etc)

Additionally, the design must include a parking plan for library-dedicated parking spaces based on square footage of the expanded facility.

The building size in the building program is only an estimate. The Town has directed the architects to develop plans for a 21,000-25,000 sq foot facility, which would triple our current 7,200 sq foot space. A 24,000 square foot building is a 24% reduction in the original 2010/2011 design schematics developed from the building program. 

Schematics--site plan, floor plans and elevations-- are required submissions as part of the grant application, due January 26, 2017. The Library Planning and Building Committee has selected Drummey Rosane Anderson, Inc (DRA) to design the required schematics, and DRA meets with the Library Planning and Building Committee on the first and third Monday of the month. All meetings are open to the public.

Please COMMENT HERE to provide feedback on Library's Building Program and proposed renovation and expansion; public input is necessary and welcome!  Click on any of the following links to learn more.

Documents
Public Presenations - Video
Procurement
About the Library
2010/2011 Project Schematics:

Please COMMENT HERE to provide feedback on Library's Building Program and proposed renovation and expansion; public input is necessary and welcome!