Fisherville Terrace 40B development

Approved 40B starting construction
Fisherville Terrace
Fisherville Terrace
  • NPC - Approved 11/812/2020 100 duplex units, 23 affordable units (2020)
  • Approved 42 Single family units, 30 duplex units, 18 affordable units (2010)
  • Comprehensive permit approved December 3, 2010
  • 1 year extension to start construction to December 3, 2014
  • 1 year extension to start construction to December 3, 2015
  • 1 year extension to start construction to December 3, 2016
  • 1 year extension to start construction to Decmeber 3, 2017
  • 1 year extension to start construction to Decmeber 3, 2018
  • 1 year extension to start construction to December 3, 2019
  • 1 year extension to start construction to December 3, 2020
  • Construction to begin in Spring/Summer 2019
  • Meeting for NPC - elimination of drainage connection 11/15/2018/ at 7:30 p.m. Conference Room A
  • Continued to 12/5/2018 at 7:00 p.m. in Conference Room A
  • Continuation of NPC - elimination of drainage connection  - Continued to 1/17/2019 at 8:00 p.m. - Conference Room A
  • January 17, 2019 application withdrawn without prejudice
  • February 28, 2019 - Board approved and signed the mylar plans
  • Meeting for NPC - change number of buildings from 57 to 50 and number of units from 72 to 100 - 9/24/2020 7:00 p.m. via Zoom Conference or live on Grafton Cable Channel 192 for Charter or 34 for Verizon
  • Continued to Thursday, October 22, 2020 at 7:00 p.m. via Zoom Conference or live on Grafton Cable Channel 192 for Charter or 34 for Verizon
  • Continued to Thursday, November 12, 2020 at 7:00 p.m. via Zoom Conference or live on Grafton Cable Channel 192 for Charter or 34 for Verizon
  • Granted:  Thursday, November 12, 2020
  •  
AttachmentSize
PDF icon Signed and filed comprehensive permit1.01 MB
PDF icon 1 year extension to 12/3/201427.99 KB
PDF icon 1 year extension to 12/3/201530.35 KB
PDF icon 1 year extension to 12/3/201630.38 KB
PDF icon 1 year extension to 12/3/201727.92 KB
PDF icon 1 year extension to 12/3/201836.99 KB
PDF icon Engineered plans dated 7/23/201832.39 MB
PDF icon Revised Storm Water Management Report 9/10/20189.53 MB
PDF icon Outline of NPC on the plans dated 10/10/201818.55 KB
PDF icon 1 year extension to 12/2/201933.97 KB
PDF icon 1 year extension to 202029.65 KB
PDF icon Legal notice for NPC - elimination of the drainage connection40.14 KB
PDF icon Comments from Sewer and DPW regarding NPC35.95 KB
PDF icon Withdrawal decision49.45 KB
PDF icon Final approved and signed engineered plans26.37 MB
PDF icon NPC - notice of project change952.27 KB
PDF icon NPC request 8/17/202049.46 KB
PDF icon Architectural Plans of units 8/17/20202.98 MB
PDF icon Revised desgin layout of development with all duplexes 8/17/20206.66 MB
PDF icon Revised legal notice for NPC - change number of units and buildings 9/1/202058.5 KB
PDF icon Comments from DPW 9/14/202020 KB
PDF icon Comments from Chief of Police 9/15/202027.3 KB
PDF icon Comments from BOH 8/31/202024.33 KB
PDF icon comments from School Dept. 9/17/202042.37 KB
PDF icon Comments from Graves Engineering 9/24/202068.48 KB
PDF icon cost estimates, unit matrix, locaton of affordables within development 10/13/2020530.52 KB
PDF icon Updated traffic report 10/19/20202.89 MB
PDF icon Letter from SGWD 10/21/202027.79 KB
PDF icon Site Work detail cost breakdown418.15 KB
PDF icon Intersection Sight distance Analysis38.75 KB
PDF icon Graves comments on intersection site distance633.12 KB
PDF icon Comments from DPW and State on Main Street project53.43 KB
PDF icon Request for 1 year extension23.33 KB
PDF icon Revised Instersection Sight Distance analysis42.31 KB
PDF icon MADOT Main Street Plans566.82 KB
PDF icon Signed and filed decision for NPC1.71 MB